Home  /  Render & Insulation

External wall insulation & render.

Roughly a fifth of Scotland’s housing stock is solid wall — no cavity, no insulation, and up to a third of the heat going straight out through it. This is the upgrade that makes every other upgrade cheaper to run.

Why it matters

You can’t generate your way out of a leaky house.

Solar and heat pumps change where your energy comes from. Insulation changes how much you need in the first place — and that saving never degrades, never needs servicing and never goes offline.

35%of a home’s heat can go out through uninsulated solid walls — the single biggest leak in most older Scottish homes
2–3 bandstypical EPC improvement, which matters at sale and is already a hard requirement for many landlords
30+ yrsexpected life of a properly installed insulation and render system — fit it once

What wrapping your walls is worth

The Energy Saving Trust puts the annual saving from external wall insulation at around £150 for a mid-terrace, £280 for a semi-detached and £500 for a detached house. It is not a one-off — it is every year, for as long as you own the house.

Every year, no servicing

Figures: Energy Saving Trust, gas-heated home, July 2026 fuel prices. Your own figure depends on your property and how you heat it — we work it out at survey.

What we offer

Rendering & insulation services

01

External wall insulation

We fix 60–100 mm of insulation board to the outside of your walls, then finish it with a mesh-reinforced basecoat and render. Because the insulation sits outside the masonry, you lose no internal floor space and the walls stay warm — which is what stops condensation forming.

02

Roughcast, dry dash & modern render systems

Roughcast is what most Scottish houses wear, and it is the finish we lay most often. We also apply dry dash, monocouche and silicone systems — over insulation or straight onto sound existing walls. Which one suits you depends on the wall behind it, how exposed the property is, and the look you are after. We will tell you at survey which we would put on our own house, and why.

03

Repairs & recovery

Failed pebbledash, cracked cement render, damp patches and blown areas. We strip back to sound substrate and rebuild the system properly rather than skimming over a problem that will come back in two winters.

04

Accredited systems, system guarantees

Wetherby and Baumit systems, fitted by a manufacturer-accredited installer. Before an insulated system goes on a wall the masonry is pull-out tested and the manufacturer produces a site survey for your property. That paperwork is what a ten-year guarantee on the whole system stands on — and it is handed to you, not filed with us.

The build-up

What actually goes on your wall.

EWI is a system, not a product. Every layer does a job, and skipping one is where failures come from.

1

Substrate preparation

Existing render assessed and made good, rainwater goods removed, sills and reveals prepared. Anything unsound comes off before we start.

2

Insulation board

60–100 mm EPS or mineral wool, mechanically fixed and adhesive-bonded. Thickness is set by your wall construction and the U-value we’re targeting, not by a standard spec.

3

Reinforced basecoat

Polymer basecoat with an embedded fibreglass mesh. This is the layer that stops cracking, and it’s the one most often skimped on.

4

Primer & finish render

Roughcast, dry dash, monocouche or silicone topcoat in your chosen colour and texture, plus new beads, sills and reveals so the detailing looks deliberate rather than patched.

Mineral wool boards mechanically fixed and a reinforced basecoat being combed out over embedded mesh

Mesh embedded in the basecoat, not laid on it

Mineral wool boards mechanically fixed, then the reinforced basecoat combed out with the fibreglass mesh bedded inside it rather than pressed onto the face. This is the layer nobody sees once the finish goes on — which is exactly why it gets skimped.

Roof verge extended on new timber battens with a new fascia board, so the roofline oversails the added insulation thickness

The roofline has to come out with the wall

Add 90–100 mm of insulation and the existing verge no longer oversails the wall. Here the roofline is extended on new battens with a new fascia fitted, so water still runs clear of the system. Skip this and the water runs down the back of the insulation instead — which is the single most common reason EWI fails in Scotland.

A real job, start to finish

Twenty years old, and the render was coming off.

Not an old building — a house of around twenty years. The render had lost its bond across the whole elevation, and after a big storm it started coming away. There was nothing worth patching, so we took all of it off and rebuilt in two coats. July 2024. The dates are the ones the camera recorded.

Gable stripped back to bare blockwork with scaffold up and beads being fixed
16 July · 9:18amStripped back to sound blockwork. Once render has lost its bond there is nothing left to key into — so all of it comes off, not just the part that fell.
Front elevation stripped, windows masked, team working from the scaffold
16 July · 10:37amThe whole elevation, not the damaged patch. Beads and stop ends set out, every opening masked, before any material touches the wall.
Finished dry dash gable with new lead flashing above the porch roof
18 July · 1:59pmRebuilt in two coats. Gable finished, with new lead flashing dressed in above the porch roof rather than sealed over.
Completed front elevation in new dry dash render
18 July · 2:06pmFinished front elevation — two coats across the whole face, with every opening and the brick base course detailed in.
Before & after

Drag the handle. Same house.

Roughcast, dry dash and render across Perth, Dundee, Fife and Angus. Our own jobs, our own photos.

House front in dated brown pebbledash with white trims The same front in new pale render with grey sills and reveals BeforeAfter
New render, contrasting revealsDated brown pebbledash replaced with a pale render system, sills and reveals detailed in grey.
End-terrace house with tired brown pebbledash before work The same house finished in fresh grey harling with a painted base course BeforeAfter
Full re-harl, front and gableBase course made good and finished; fresh grey harling over the whole elevation.
Finishes

Recent render work across the area

White, cream and beige dash, smooth silicone in colour, roughcast on gables — the finish is chosen to suit the house and the street, not a standard spec.

Semi-detached house finished in white dry dash
White dry dash, semi-detached
Cream render on an end-terrace with grey window surrounds
Cream render, grey surrounds
Bungalow in new white dry dash with a black roofline
White dry dash, black roofline
Mid-terrace finished in white dry dash with grey reveals
White dry dash, grey reveals
Beige roughcast across a terrace, front and gable
Beige roughcast, front and gable
Cream dry dash beside a new oak front door
Cream dry dash
Smooth render in dark teal on a garden-room extension
Smooth teal render
Smooth render in soft pink on a gable and return
Smooth render, soft pink
New dry dash above a dark brick plinth on an extension
Dry dash over a brick plinth
Grey dry dash across a rear elevation
Grey dry dash, rear elevation
Pale render on a new single-storey extension
Pale render, new extension
Beige roughcast on a single-storey extension
Beige roughcast
Insulation, a new roof and in-roof solar on one property
100 mmof insulation wrapped right around the outside, under a fresh render
A whole house at once

Same house. Different building.

✕
BeforeTimber cladding with nothing behind it. A cold loft, cold floors, and an old boiler running flat out to keep up with a house that could not hold heat.
✓
After100 mm of insulation wrapped right around the outside under a fresh render. Loft and floors insulated. A new roof with solar on it. And a heating system with only a fraction of the work to do.

Nothing about the house changed except how much it costs to live in. If you are planning more than one upgrade, insulation comes first in almost every case: it permanently reduces how much energy the home needs, and it makes the solar sizing decision easier because your demand is stable and predictable.

Book a whole-property survey →
How it works

Survey to finished wall

A typical semi-detached EWI job runs 2–3 weeks on site, weather depending. Render is temperature-sensitive, so autumn slots are the last of the year.

1

Survey & assessment

We check wall construction, existing render condition, damp, and whether planning or a building warrant applies to your property.

2

Design & fixed quote

Insulation thickness, finish, colour and detailing agreed, with a fixed, itemised price set out in writing.

3

Installation

Scaffold up, system applied layer by layer with proper curing time between coats. We don’t rush render in bad weather.

4

Sign-off

Rainwater goods refitted, site cleared, and a full handover pack with the system specification and guarantee documents.

Common questions

EWI & rendering questions

How do I know if my walls are solid or cavity?

Most Scottish properties built before roughly 1930 are solid wall, and many stone-built properties well after that. A quick check is the brick pattern: if you can see short ends appearing regularly in the coursing, it’s likely solid. Wall thickness at a window reveal is another indicator. We confirm it properly at survey — and if you already have cavity walls, we’ll tell you that cavity fill is a far cheaper route than EWI.

Will it cause damp problems?

Done properly, the opposite. EWI keeps the masonry above dew point, which is what stops interior surface condensation and the mould that follows it. Problems arise when a non-breathable system is put on a solid stone wall that needs to breathe, or when detailing at sills and reveals is done badly. We specify breathable build-ups on traditional construction and we detail the junctions properly — that’s most of the job.

Do I need planning permission?

Often not, as EWI on an unlisted house frequently falls under permitted development. It does change the external appearance and wall thickness though, so listed buildings, conservation areas and some flatted properties need consent. A building warrant may also apply. We check your property’s status at survey stage and tell you what’s needed before you commit.

How much does it cost?

It depends heavily on wall area, access, existing render condition and the finish you choose, so the figure comes from a survey rather than a web page. Whatever the number, it’s worth weighing against the fact that the saving continues for thirty-plus years with no maintenance and no equipment to replace.

Can you match my neighbours’ finish?

Usually yes. Silicone renders come in a wide range of colours and textures, and we can match most existing finishes closely enough that a semi-detached pair still reads as one building. In conservation areas the finish may be specified for you as part of the consent.

Free survey

Find out what your walls are costing you.

Book a free survey. We’ll assess your wall construction, tell you what a proper EWI system would involve, and give you a fixed price — with no obligation and no hard sell.

Get a fixed price

Free survey. Tell us what the job is — we reply within one working day to book the visit.

Prefer to message? Messenger

No obligation. We only use your details to arrange the survey — see our privacy notice.

Thanks — we have your request and will be in touch within one working day to arrange the survey.
Book a free survey →